Dear Value Residents,
Please be informed that, through a vote in Apartment Building Meeting 4th and contractor selection results of BOC. From 13/12/2016 contractor will tiled the wall of ground floor elevator lobby and basement elevator lobby on the following schedule:
No. | Location | Start day | Completion date | Day off |
1 | Ground floor Block C1 Basement floor Block C1 | 13/12/2016 | 16/12/2016 |
|
2 | Ground floor Block C2 Basement floor Block C2 | 17/12/2016 | 21/12/2016 | Sunday 18/12/2016 |
3 | Ground floor Block B1 Basement floor Block B1 | 22/12/2016 | 26/12/2016 | Sunday 25/12/2016 |
4 | Ground floor Block B2 Basement floor Block B2 | 27/12/2016 | 30/12/2016 |
|
5 | Ground floor Block A1 Basement floor Block A1 | 31/12/2016 | 04/01/2017 | Sunday 01/01/2017 |
6 | Ground floor Block A2 Basement floor Block A2 | 05/01/2017 | 09/01/2017 | Sunday 08/01/2017 |
Contractor: Việt Thái CO., LTD.
Due to period, we are apologized for any inconvenient may cause.
Warm regards,
Management Office
Hoang Anh River View